50 kg/ hour capacity incinerators

In the website of yours there is initial introduction but we need more details in order to know the operational efficiency  and environmental effects of the exhaust gases from the chimney.  We need to know the composition of the exhaust gases as to whether they are meeting the standard of Pakistan environment conditions. Similarly we want to know more details of its operation. We are of the opinion that you must be making efficient incinerators and there is possibility of collaboration with your firm, if both we agree on certain terms and conditions. If we finally decide to collaborate then of course we will send our engineer for training or perhaps I will try to get some time to visit myself in your factory and office.  While going through your specifications we have found that you have also mentioned “smoke filter chamber” and mentioned that once  the exhaust gases passed through this then there is no smoke. This is knew to me and of course very much interested how the chamber works.  We would like that you should send us operational manual of one incinerator so our engineers can study that and it will clarify most of our questions. 50 kg/  hour  capacity incinerators Burning Rate: 50kos/hr Feed Capacity:  150kqs Primary  Combustion  Chamber:  900 liters Secondary  Combustion  Chamber:  300 liters Mix Combustion  Chamber:  Yes Smoke Filter Chamber:  Yes Feed Mode: Manual Power: 0.7Kw Fuel Type: Diesel Oil/ Natural Gas/LPG Internal Dimensions:  120 x 90 x 85cm (primary  chamber) External  Dimensions:  200 x 160 x 310cm (without  chimney) Burning  Efficiency:  >98%

Google快讯 – waste incinerator

waste incinerator 每天更新 ⋅ 2019年7月20日 新闻 Zimbabwe: Harare Cancels US$134 Million Waste-to-Energy Project AllAfrica.com … Dutch company Integrated Energy BV (IEBV) in May for the construction of a US$134 million waste-to-energy incinerator at the Pomona dumpsite on … 标记为不相关 Baringo referral hospital risks closure by Nema for poor waste disposal The Star, Kenya Baringo referral hospital … Read more

EPA News Release: Delaware Firm Among Recipients of EPA Small Business Grants for New Technologies

Contact:  [email protected] EPA Awards $2.3 Million in Funding for 21 Small Businesses to Develop Innovative Environmental Technologies Delaware Firm to Test Novel Technology for Remediating PFAS in Water PHILADELPHIA, July 19, 2019 – The U.S. Environmental Protection Agency (EPA) has announced $2.3 million in funding for 21 small businesses to develop technologies that will help … Read more

EPA News Release: Phila.-based Firm Among 21 Small Businesses Receiving EPA Grants

Contact:  [email protected] EPA Awards $2.3 Million in Funding for 21 Small Businesses to Develop Innovative Environmental Technologies Philadelphia-based Firm to Test Waste Water Treatment Technology   PHILADELPHIA, July 19, 2019 – The U.S. Environmental Protection Agency (EPA) has announced $2.3 million in funding for 21 small businesses to develop technologies that will help protect human … Read more

Google快讯 – waste incinerator

waste incinerator 每天更新 ⋅ 2019年7月19日 新闻 Thousands protest in central China against proposed waste incinerator World Socialist Web Site Thousands demonstrated in the central Chinese city of Wuhan recently in a week-long protest to denounce a planned garbage incinerator. 标记为不相关 Agreement closed for new waste incinerator The Daily Herald (press release) EUSTATIUS–An agreement for a … Read more

Google快讯 – waste incinerator

waste incinerator 每天更新 ⋅ 2019年7月18日 新闻 Chennai corporation's first waste incinerator to come up at Manali Times of India CHENNAI: The city's first solid waste incinerator is to be set up in Manali zone in August, followed by plants in Madhavaram and Thiruvottiyur zones. 标记为不相关 TEDxPortsmouth sets zero waste goal Seacoastonline.com “Zero waste” means having … Read more

EPA awards South Dakota Department of Environment and Natural Resources over $2.5 million grant

Contact: Lisa McClain-Vanderpool, 303-312-6077, [email protected] EPA awards South Dakota Department of Environment and Natural Resources over $2.5 million to improve water quality and watershed health throughout the state DENVER (July 17, 2019) – The U.S. Environmental Protection Agency (EPA) has awarded $2,574,000 to the South Dakota Department of Environment and Natural Resources (SD DENR) to … Read more

TS50 Medical/General waste incinerator

Design, supply and manufacture ex works of one Surefire Manual Load TS50/1 Medical/General waste incinerator as detailed below: –  Waste type: Mixed type o,1,2,3,&4 hospital/clinical bio hazard waste  Waste density: 125 to 350Kg/M3  Waste CV: 4000 KCAL/kg  Moisture content: 10-25%  Estimated ash residue: 5-10%  Nominal capacity: 30Kg/hour batch load  Secondary chamber: 0.5 second @ 850oC Equipment  1No. Surefire TS50/1 Manual Load Incinerator comprising: –  Manual loading door  Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long   Full sized bulk load/ash removal door  1 off diesel-fired ignition burner – temperature  controlled  1 off combustion air supply fan and distribution system, automatic control  High capacity secondary combustion chamber 0.5 second @>850oC  1 off diesel-fired afterburner – temperature controlled  Control panel – automatic operation  Temperature indication primary and secondary chambers 0-1200oC  Refractory lined flanged chimney to a height of 6M

medical waste and general waste Incinerate

Incinerate: medical waste and general waste Capacity to burn waste: 400-500kg/hr Fuel: Diesel Fuel Consumption: 10 liters/hr maximum Incineration temperature: 950-1300 degrees centigrade Casing: thick (min 5mm) stainless steel casing and fully insulated to withstand sea humidity Voltage 220/240v or 380/415V Frequency 50Hz Feeding: Automatic Ash/leftovers removal: Automatic Flue gas filtration system: Yes Quantity: Four (4)  Type: Pyrolytic  Use: For drugs  With Chassis to be Mounted in truck/lorry  May have a primary and secondary combustion chamber  Must have a dilution chamber Capacity: 100 Kgs per hour Power Source: Diesel or Natural Gas or Liquified Natural Gas 

Google快讯 – waste incinerator

waste incinerator 每天更新 ⋅ 2019年7月17日 新闻 Trash Piles Up as Lebanon Waits for an Answer The Jerusalem Post City of Beirut delays talk of incinerators – to the approval of residents – while some claim that country's waste management is befouled by corruption. 标记为不相关 Uganda: Hospital Stuck With Faulty Incinerator for Two Years AllAfrica.com Masaka … Read more